Manage supply demands
When managing supply demands, it is important to note that, depending on the product management configuration linked to the supply, the NDD Orbix portal will behave as follows:
If the supply is with a forced capacity or forced product: the linked product and its capacity will be taken into account for calculating indicators, disregarding data from printer readings.
If the demand is generated with a forced product and its capacity is less than 100 or greater than 10,000,000, this capacity will be considered invalid. In this case, the indicators will be indeterminate due to the absence of valid information about the supply's capacity.
If the supply has the product prioritized according to demand: the product of the same model, type and color as the last demand linked to the printer will be considered for calculating indicators, disregarding data from printer readings. If there is still no demand linked to the printer, the system will consider the product forced until a demand is finalized.
If the supply and compatibility have been registered automatically or manually: when generating demands, if:
- there is a standard product, it will be considered in the demand
- there is no standard product, the compatible product will be considered in the demand, prioritizing the compatible product that meets the characteristics of the supply
The supply replacement product can be changed at any time by the user before the demand is finalized, if desired.
To better understand the importance of the data presented, see Supplies management.
For supply alerts and demands to be generated, you need to review the configuration of the rules.
The demand will then follow the following flow:
Automatic generation by the system of supply alerts running low based on the rules configured by the user
The user requests the orders manually or through the system, depending on the rule configuration
User monitoring of planned demands, being able to change the product or status of the demand if desired
Finalization of demands by the user manually or through the system, depending on the rule configuration, or refusal of demands
{{component-feedback-article}}